Gode Airport Solar Project
The project serves the Extended VHF and ADS-B Station of the Ethiopian Civil Aviation for Gode Airport. The system has an installed capacity of a 40kWp Solar PV system and a 150kWh Lithium Ion Battery Energy Storage System (BESS). This system was integrated with both the existing diesel generator and the grid.